in Davao City Philippines sales price shop near me near me shop factory supplier Shantui SD22 22ton 4.5m3 Dozing Bucket Bulldozer Hydraulic Crawler with Three Teeth Back Ripper manufacturer best Cost Custom Cheap wholesaler

  in Davao City Philippines  sales   price   shop   near me   near me shop   factory   supplier Shantui SD22 22ton 4.5m3 Dozing Bucket Bulldozer Hydraulic Crawler with Three Teeth Back Ripper manufacturer   best   Cost   Custom   Cheap   wholesaler

Innovative thermo treatment method products, these kinds of as community heat treatment oven, multi-use thermo therapy oven, and so forth. We are aiming to satisfy the requires of the clientele around the planet.. Owing to our sincerity in supplying best support to our consumers, understanding of your needs and overriding feeling of responsibility toward filling ordering specifications, SHXiHu (West EPT) Dis.HU (WEST LAKE) DIS.I SD22 22ton 4.5m3 dozing bucket bulldozer EPT crawler with a few teeth back again ripper

I.Main Specification

I . Motor
Manufacturer: WEICEPTI engine
Design: WD12G240E16
Sort: H2o cooled 4-cycle, in line, overhead valve direct EPT, turbocharged diesel
Rated revolution:1800rpm
Rated EPTT:162KW
CylinEPTTnumber-bore X stroke :six-139.7 x 152.four
Piston displacement :11.6L
Rnted fuel intake: 205g/kw.h
Max.Torque:1030N.m/1250rpm

Gear 1st 2nd third
EPTT (km) -3.six -six.five -11.2
Reverse (km) -4.three -7.seven -13.2

Dozer Straight-tilt
Min. floor clearance(mm) 405
Weight(kg) 23450
Ground strain(MP) .077
Min.turning radius(m) 3.3
Gradeability ( deg) 30
Observe gauge(mm) 2000
Dozing capability(m3) 6.4
Blade width(mm) 3725
Blade top(mm) 1315
Max.drop beneath ground (mm) 540
Max.tilt adjustment(mm) gt 735

II. EPTT TRANEPTITTING System
Torque converter: torque converter, 3-component,one-phase,1-section
EPTT: Planetary EPT variety, multi-disc cluth, EPTally related, compelled lubrication
Principal EPT: Spiral EPTTl EPT ,Single-phase speed reduction, Splash lubrication
Steering EPTT:Soaked.multi-disc, EPT loaded, EPT divided, EPT control
Steering brake:Moist,Floating, immediate on-off EPT inter-linking procedure
Ultimate EPT: two-stage pace reduction of spur EPT splash lubrication.

III . UNEPTTCARRING Method
Variety: EPTg kind of sprayed beam, suspended composition of equalizer bar
Carrier rollers(every aspect): Two
Keep track of rollers(each and every aspect): Six
Keep track of variety: assembled single tooth sneakers
Width of observe shoes:560mm
Pitch: 216mm
IV. HYEPTTLIC Program
Max.stress: 14MPa
EPT type: EPT pump
Discharge: 262L/min
Bore of operating cylinEPTTx number : 120mm x2 (double-acting kind)
V. EPTT Take OFF SEPTFT
Location: At the center of the back again of steering situation
Revolution: 1800rpm
VI. Overall Proportions
Duration x Width x HeigEPTT (mm): 6805 x 3725 x 3395

II.EPTT Data
ShXiHu (West EPT) Dis.Hu (West EPT) Dis.i series bulldozers incEPTT twelve horseEPTT grades, i.e. 520, 420, 320, 240, 230, 220, 200, one hundred sixty, a hundred thirty, 110, a hundred and 80, and incEPTT variant items, this kind of as stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd type, wet-land sort, tremendous damp-land type, desert type, plateau variety, coal bulldozing kind, forest lumbering kind and environmental sanitation type. Bulldozers of different models can be configured with any of the pursuing XiHu (West EPT) Dis.Hu (West EPT) Dis.llary products, this kind of as direct dumping blade, angle blade, U-formed blade, environmental sanitation blade, air conditioning cab, anti-rolling cab, simple taxi, tripe-tooth ripper, single-tooth ripper, winch and have scraper. The bulldozers are mostly utilised to functioning situations incXiHu (West EPT) Dis.Hu (West EPT) Dis. airport, road, EPT, dam, railway, and so on.

III.Bulldozer Doing work

IV Oversea Provider
Service
one). EPT layout in accordance to your EPTT need
2). EPT spare parts orEPTTon line by way of our internet site freely
three). Comprehensive specialized instruction books help you to operate the EPTT and make servicing very easily.
4). On line and on website education or service. We welcome our sellers to send their engineers to EPTT for yearly provider instruction. Meanwhile, we also deliver out our personal engineers to international nations for train and service .

V.Social Duty

The highway in the catastrophe spot ended up ruined seriously owing to the earthquake, Our organization will fitst time to start off the contingency strategies to assistance the catastrophe region.

VI. EPTT

We generally decide on the RO-RO vessel or the Bulk Cargo Vessel to transportation our EPTT.

VII. Working Procedure

one. You deliver us an inquiries on your preferred trailer through our speak to details.
2. We shall reply you in 12 hours following we EPTd our inquiry.
3. We will negotiate the detail of the trailer on your requirement.
four. Confirmed on the tech data.
5. EPT agreement.
6.30% down payment or LC issuing.
7. Generation
eight. The Manufacturig approach with up to date news.
9. The Generation completement.
10.Equilibrium payment .
11.Prepare Shipment and Custom made Clearance

VIII. EPT EPT Parts
We offer the authentic EPT Components. With a comprehensive after-revenue service method, the Right after-market place Division offers superb services, and employs streamlined offer EPT to give speedy components delivery.

  in Davao City Philippines  sales   price   shop   near me   near me shop   factory   supplier Shantui SD22 22ton 4.5m3 Dozing Bucket Bulldozer Hydraulic Crawler with Three Teeth Back Ripper manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Davao City Philippines  sales   price   shop   near me   near me shop   factory   supplier Shantui SD22 22ton 4.5m3 Dozing Bucket Bulldozer Hydraulic Crawler with Three Teeth Back Ripper manufacturer   best   Cost   Custom   Cheap   wholesaler