If you want any details or samples, you should contact us and you will have our shortly reply. Hangzhou EPG Co.,Ltd. , was established in November, 1997. With its five wholly owned subsidiaries. Every single approach, every area, each perform in EPG is demanded to be completed one particular step subsequent one more, very carefully and cautiously, from materials assortment, reformation to producing add-ons, from parts warmth treatment method to computerized assembly, from top quality management to product inspection and tests and from purchase dealing to soon after sales service. With 30-year rich market experience and knowledge comma we have earned EPTTization in manufacturing and supplying exceptional high quality Massive EPTs time period These are fabricated in conformity with described business stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds comma these compact and sturdy EPTs have stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd working speed and torque measurement interval The presented range is widely acknowledged by the buyers for features like optimum efficiency comma strong design and EPTTer life time period These precision engineered EPTs are broadly demanded across varied EPTT comma in which large EPT reduction is essential period
Benefits colon
– EPT with Consumers apos Designs
– EPT Machining amp Heat Therapy Abilities
– Stringent EPTT EPTT
– Prompt Shipping
-Experience in Cooperation with EPTT 500 Firms
Process colon
EPT solEPTT
Normalizing ampTempering-Evidence Machinnig
Quenching ampTempering
Complete Machining lparTeeth EPT rpar
We can offer you you in different method situations
Answers for A lot of Conclude Marketplaces and Applications
–EPT
–EPTlurgy
–EPTT Era
–SuXiHu (West EPT) Dis.Hu (West EPT) Dis.
–Cement Plant
–Port EPTTry
–Oil and organic
–Papermaking
–OEM EPT case
–EPTT EPTT
Requirements of EPT colon
No interval | Item | Description |
1 | Diameter | le15m |
2 | Module | le45 |
three | EPT | Cast Alloy Metal comma Forged EPTT Metal comma Solid Alloy Metal comma Forged EPTT Steel |
4 | Composition From | Built-in comma Half to 50 percent comma 4 Parts and Much more Items |
five | Warmth Remedy | Quenching amp Tempering comma Normalizing amp Tempering comma Carburizing amp Quenching amp Tempering |
six | Tooth Type | Annular EPT comma Outer EPT Ring |
seven | StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | ISO comma EN comma DIN comma AISI comma ASTM comma JIS comma IS comma GB |
Inspection and Check Define of Girth EPT colon
No period | Product | Inspection Location | Acceptance Standards | Inspection Stage | Certificates |
one | EPTT Composition | Sample | EPT Necessity | When Smelting Right after Heat Remedy |
EPTT Composition Report |
two | EPT Houses | Sample lparTest Bar on the EPT Body rpar | EPTnical Requirement | Soon after Heat Remedy | EPT Homes Report |
three | Heat Treatment | EPTT Body | EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | During Warmth Therapy | Heat Therapy Report Curves of Heat Treatment method |
four | Hardness Examination | Tooth Floor comma 3 Details For each 90 deg | EPTnical Necessity | Soon after Warmth Therapy | Hardness Teat Report |
Following Semi End Machining | |||||
five | Dimension Inspection | EPTT Entire body | Drawing | After Semi End Machining | Dimension Inspection Report |
Complete Machining | |||||
six | EPTic EPTT Examination lparMT rpar | Tooth Floor | Agreed StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | After End EPT Hobbing | MT Report |
7 | UT | Spokes Components | Agreed StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Right after Tough Machining | UT Report |
After Welded | |||||
Following Semi Finish Machining | |||||
eight | PT | Defect Area | No Defect Indicated | Soon after Digging Right after Welded |
PT EPTrd |
9 | Mark Inspection | EPTT Body | EPT StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | Closing Inspection | Photographs |
ten | Visual appeal Inspection | EPTT Human body | CIC aposs Requirement | Before EPTT lparFinal Inspection rpar |
|
eleven | Anti-rust Inspection | EPTT Body | Agreed Anti-rust Agent | Before EPTT | Pictures |
12 | EPTT Inspection | EPTT Body | Agreed EPTT Type | Throughout EPTT | Photographs |
FaXiHu (West EPT) Dis.Hu (West EPT) Dis.ties For EPT EPT ring colon
No period | Item | Description |
one | Smelting amp EPTT Ability | 40t comma50t comma 80t Sequence AC Electric powered Arc Furnace two times150t comma 60t EPTT Ladle Refining Furnace 150t comma 60t Collection VD solVOD Furnace 20 times18m Massive Pouring FaXiHu (West EPT) Dis.Hu (West EPT) Dis.ty We can pour 900t refining liquid metal a single time comma and attain EPT poured 600t steel ingots interval We can make the substantial quality metal of more than 260 metal grades as carbon metal commastructural alloy metal and the structural metal comma refractory metal and stainless steel of EPTT prerequisite period The maXiHu (West EPT) Dis.mum weight of casting steel comma grey casting comma graphite solid iron and non-ferrous casting is 600t comma 200t comma 150t and 20t separately period |
2 | EPT Functionality | The only a single in the word comma the most technologically EPTd and the greatest specification18500t Oil Push comma outfitted with 750t periodm forging operation EPTT 8400t Drinking water Press 3150t Water Press 600t H2o Press Phi5m EPT EPT Ring Mill lpar WAGNER commaGermany rpar Phi12m EPT EPT Ring Mill We can roll rings of various EPTs of carbon steel comma alloy steel comma substantial temperature alloy metal and non-ferrous alloys such as copper alloy comma EPT alloy and EPTTium alloy time period Max period of time Diameter of rolled ring will be 12m period of time |
three | Heat Remedy Capability | nine times9 times15m comma8 times8 times12m comma6 times6 times15m comma15 times16 times6 period5m comma16 times20 times6m comma7 times7 times17m Collection Warmth Furnace and Heat Remedy Furnaces phi2 period0 times30m comma phi3 period0 times5 period0m Series Warmth Therapy Furnaces phi5 period0 times2 period5m comma phi3 period2 times1 period5m comma phi3 period0 times5 period0m comma phi2 period0 times5m Sequence Carburizing Furnaces amp Nitriding Furnaces amp Quenching Bathes phi2 period0 times30m Properly Variety CNC EPT Furnaces Phi3 period0 times5 period0M Horizontal Fuel Temperature-differential Furnace EPTT-frequency and EPTT-position Quenching Lathe of Pinion Shaft |
four | Machining Functionality | one time period geq5m CNC EPT Duty Vertical Lathes 12m CNC EPTT-column Vertical Lathe 10m CNC EPTT-column Vertical Lathe 10m CNC One-column Vertical Lathe six period3m EPT Obligation Vertical Lathe 5m CNC EPT Obligation Vertical Lathe |
two period of time geq5m Vertical EPT Hobbing EPTTs 15m CNC Vertical EPT Hobbing EPTT 10m EPT Hobbing EPTT 8m EPT Hobbing EPTT 5m EPT Hobbing EPTT 3m EPT Hobbing Machining |
||
three interval EPTTorted EPT-precision EPT EPT EPTTs period8m~three period5m CNC Molding EPT EPT EPTTs |
||
4 period Huge Dull amp Milling EPTTs 220 CNC EPTr-mounted Boring amp Milling EPTT two hundred CNC EPTr-mounted Unexciting amp Milling EPTT 160 CNC EPTr-mounted Uninteresting amp Milling EPTT |
Tests Procedure colon
middot QA DOC colon EPTT Composition Report comma EPT Qualities Report comma UT Report comma Warmth Treatment method Report comma Dimensions Verify Report
middot The knowledge on chemical composition report and mechanical qualities report are accepted by 3rd get together comma HangEPT Ship EPT EPT Institute comma CSIC period of time
middot UT examination colon 100 percnt ultrasonic examination in accordance to EN15718-three comma SA388 comma Sep 1921 C solc and many others time period
middot Warmth Remedy Report colon offer authentic duplicate of heat therapy curve soltime table period